NFPA 99-2012, section 5.1.3.5.15.2 (7) states: EOSCs shall consist of… “Minimum of 1 m (3 ft) of clearance around the EOSC for connection of temporary auxiliary source.”
Does this mean on all sides, including elevations, as in the connection must be 3’ above finished grade? Or does this mean a service clearance of 3’ in front of the EOSC?