Please see attached youtube link of a hotspot hospital in Teaneck NJ where we verified some of the new construction they were talking about in the video.
https://www.holyname.org/covid19construction
Everyone should view. The first ICU area had all the med gas outlets installed in the rooms. The second ICU are had one set of oxygen and vacuum outlets inside at the patient headwall and on the outside wall another set of Oxygen, air and vacuum outlets were installed.
This way the vents could be on the outside of the room.
The first area had 32 beds and the second area had 45 beds and the 2 week period between installations you can see the innovations to improve efficiency and employee safety.