    The following two documents are required per NFPA 99 the 2012 Edition before verification. My question only for a straw vote is.


    What percent of time is this document really provided ?



    5.1.12.2.6.7  The 24-hour standing pressure test of the positive pressure system shall be witnessed by the authority having jurisdiction or its designee. A form indicating that this test has been performed and witnessed shall be provided to the verifier at the start of the tests required in 5.1.12.3.


    5.1.12.2.7.6  The 24-hour standing pressure test of the vacuum system shall be witnessed by the authority having jurisdiction or its designee. A form indicating that this test has been performed and witnessed shall be provided to the verifier at the start of the tests required in 5.1.12.3.


  • Friday, September 13, 2019 12:55 PM
    Reply # 7879751 on 7878284

     Pretty close to never. 

  • Friday, November 08, 2019 8:59 AM
    Reply # 8097928 on 7878284
    Anonymous

    That's up to the individual performing the verification. If they request/require it, the answer should be every time a verification is done.